BG-RRP-4.032-0170-C01
Construction of a local energy storage system to an existing photovoltaic plant
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
08.11.2025
08.11.2025
31.03.2026
In execution (starting date)
Location of Performance
- Bulgaria, South-West and South Central Bulgaria (BG4), South Central (BG42), Plovdiv (BG421), Maritsa, Tsaratsovo
