BG-RRP-4.032-0019-C01
Renewable electricity generation and electricity storage with an installed capacity of 4,8 MW
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
06.03.2025
06.03.2025
31.03.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), South-East (BG34), Sliven (BG342), Sliven, Sliven
