BG-RRP-4.034-0142-C02
Construction and commissioning of facilities for storing electricity from renewable sources with 10MW power and a capacity of 45MWh at the level of the electricity grid by "Izida - 1894" EOOD
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
26.08.2025
26.08.2025
30.06.2026
In execution (starting date)
Location of Performance
- Bulgaria, South-West and South Central Bulgaria (BG4), South-West (BG41), Sofia (BG412), Elin Pelin, Elin Pelin
