BG-RRP-4.034-0077-C02
Construction and commissioning of a 30.96 mWh BESS in Valchedram
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
29.08.2025
29.08.2025
30.06.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), North-West (BG31), Montana (BG312), Valchedram, Valchedram
