BG-RRP-4.033-0008-C01
Delivery and installation of a Local Storage System with a capacity of 3 MW and a total capacity of stored energy of 7,454MWh at an existing PEP with a nominal AC capacity of 6,845MW
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
06.03.2025
06.03.2025
31.03.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), North Central (BG32), Veliko Tarnovo (BG321), Strazhitsa, Strazhitsa
