BG-RRP-4.033-0052-C02
Construction of a combined project with an installed capacity of the 10.8 MW component and local energy storage system with a capacity of 4,472 MW
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
31.12.2024
31.12.2024
30.06.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), North Central (BG32), Razgrad (BG324), Razgrad, Razgrad
