Programme: Recovery and Resilience Plan

Planning region: All

Identification

BG-RRP-4.032-0184-C02
Construction of a local energy storage system with an installed capacity of 1450 kW to a photovoltaic power plant owned „CPK ARO“ EOOD with an installed capacity of 2999 kW built, in the process of commissioning.
176789460 MINISTRY OF ENERGY
14.03.2025
14.03.2025
30.06.2026
In execution (starting date)
Location of Performance
  • Bulgaria, North and South East Bulgaria (BG3), North-West (BG31), Pleven (BG314), Dolna Mitropolia, Trastenik

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.