BG-RRP-4.032-0095-C02
Construction of new power generation facilities from renewable sources with an AC power of 5MW and an ELS for electricity storage with a power of 1.53 MW and a capacity of 3.06 MWh in PI 53833.6.232
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
19.02.2025
19.02.2025
30.06.2026
In execution (starting date)
Location of Performance
- Bulgaria, South-West and South Central Bulgaria (BG4), South Central (BG42), Plovdiv (BG421), Rodopi, Orizari
