BG-RRP-4.033-0070-C01
Construction of a local energy storage system (LSS) with an installed capacity of 1.725MW and a storage capacity of 4MWh for a photovoltaic plant with an installed capacity of 3,63MW
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
10.11.2025
10.11.2025
31.03.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), North-West (BG31), Pleven (BG314), Belene, Belene
