BG-RRP-4.032-0153-C01
Combined project for construction of a co-located Battery Energy Storage System (BESS) with rated power capacity of 0.4 MW and minimum energy capacity of 0.86 MWh together with a new built Photovoltaic Power Plant (PvPP) for the production of electrical energy with a nominal generating capacity of 0.99463 MW located on LP 14275.610.593, village of Gavrailovo, Sliven region
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
14.07.2025
14.07.2025
31.03.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), South-East (BG34), Sliven (BG342), Sliven, Gavrailovo