BG-RRP-4.032-0083-C02
Delivery and installation of a local storage system with a capacity of 0.4 MW and a total capacity of stored energy of 0.928 MWh at an existing FEC with a nominal alternating current capacity of 0.9 MW
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
12.02.2025
12.02.2025
30.06.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), South-East (BG34), Stara Zagora (BG344), Maglizh, Maglizh
