BG-RRP-4.032-0051-C02
Construction of a local storage facility - LSF with a capacity of 800 kW and a total operating capacity of 1720 kWh to a Photovoltaic power plant with an installed capacity of 1715 kW, located in PI 20465.501 according to the plan of the city of Devin, municipality. Devin
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
13.02.2025
13.02.2025
30.06.2026
In execution (starting date)
Location of Performance
- Bulgaria, South-West and South Central Bulgaria (BG4), South Central (BG42), Smolyan (BG424), Devin, Devin
