BG-RRP-4.032-0096-C02
Construction of new power generation facilities from renewable sources with an AC power of 5MW and an ELS for electricity storage with a power of 1.53 MW and a capacity of 3.06 MWh in PI 53833.6.233
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
15.01.2025
15.01.2025
30.06.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), South-East (BG34), Burgas (BG341), Nesebar, Orizare
