BG-RRP-4.032-0272-C01
Delivery and installation of a 200 KW battery energy storage system for a 0.5 MW photovoltaic power plant of Pipe Industrial Bulgaria Ltd.
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
10.02.2025
10.02.2025
31.03.2026
In execution (starting date)
Location of Performance
- Bulgaria, South-West and South Central Bulgaria (BG4), South-West (BG41), Sofia (BG412), Samokov, Samokov
