UMIS Number | BG-RRP-6.004-4071-C01 |
Project Name | The construction of an autonomous photovoltaic installation for the production of electrical energy for own needs |
Beneficiary | 040580486 GRIMI-HYUSEIN HYUSEIN SOLE TRADER |
Funding | RRF ==> Recovery and Resilience Plan |
Date of the Contract/Order | 14.06.2024 |
Start Date | 14.06.2024 |
End Date | 14.06.2025 |
Status of Implementation of the Contract/Order of the Grant | Contracted |
Location of Performance |
|
Brief description |
ЕТ „Грими – Хюсеин Хюсеин“ осъществява дейности по производство и реализация на животновъдна продукция – угоени прасета. Инвестиционното предложение на ЕТ Грими - Хюсеин Хюсеин е свързано с модернизацията и повишаването на устойчивостта на съществуващото земеделско стопанство, чрез изграждането на автономни фотоволтаична електроцентрала (ФЕЦ) за собствени нужда в три поземлени имота както следва: Изграждане на автономна фотоволтаична електроцентрала (ФЕЦ) с мощност 37,62 kWp и модулна батерия с капацитет 97Wh за собствени нужди“ в ПИ 55155.7.84 с местонахождение гр. Пазарджик, м. „Зайкови мандри“. Изграждане на автономна фотоволтаична централа (ФЕЦ) с мощност 37,62 kWp и модулна батерия с капацитет 97kWh за собствени нужди“ в ПИ 56277.1.135 с местонахождение гр. Пещера, м. „Курията“. „Изграждане на автономна фотоволтаична електроцентрала (ФЕЦ) с мощност 100,32 kWp и модулна батерия с капацитет 200kWh, за собствени нужди“ в ПИ 66559.5.32 с местонахождение гр. Пазарджик, с.Синитово, м. „Ламбурките“. |
Activities |
|
Partners | None |
Contractors | None |
Subcontractors | None |
Members of the Consortium | None |
Notes: * The projected contract value may be lower than the reported one because of any of the following reasons:
** This column represents the amount of costs claimed by the beneficiary |
Indicator 1 | Award of grant agreements for support under the Fund to promote the technological and ecological transition of agriculture, Measure Unit: Брой, Base Value: 0.00 , Target amount: 0.00 , Reached amount: 0.00 |
Indicator 2 | Installed additional operational renewable energy capacity in MW, Measure Unit: Мегават, Base Value: 0.00 , Target amount: 0.18 , Reached amount: 0.00 |
Indicator 3 | Number of supported project beneficiaries through the Fund, Measure Unit: Брой, Base Value: 0.00 , Target amount: 1.00 , Reached amount: 0.00 |
Total Project cost | 993 766.22 BGN |
Grant | 496 883.10 BGN |
Self amount | 496 883.12 BGN |
Total actual amounts paid | 0.00 BGN |
Percentage of EU co-financing | 100.00 % |
None | |
Notes: 1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower. 2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment. |
There are no tender procedures |
Notes:
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN