Identification
Name | Address |
200430089 ST KONSULT | България, с.Герман, 1186, ул.ПАТРИАРХ ГЕРМАН, номер 73 |
List of projects in which the organization is involved as a contractor
Project Name | UMIS Number | Contracts amount | Reported amount |
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 | BG16RFOP002-2.073-22366-C01 | 0.00 | 800.00 |
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 | BG16RFOP002-2.073-23343-C01 | 0.00 | 900.00 |
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 | BG16RFOP002-2.073-23098-C01 | 0.00 | 300.00 |
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 | BG16RFOP002-2.073-23410-C01 | 0.00 | 2 448.00 |