Identification

UMIS Number BG06RDNP001-7.020-0052-C05
Project Name "Increasing the energy efficiency of municipally owned buildings in the Municipality of Samuil"
Beneficiary 000505928 OBSHTINA SAMUIL
Funding EZFRSR ==> Rural Development Programme
Date of the Contract/Order 05.08.2024
Start Date 05.08.2024
End Date 30.09.2025
Status of Implementation of the Contract/Order of the Grant Contracted
Location of Performance
  • България, Северна и югоизточна България (BG3), Северен централен (BG32), Разград (BG324), Самуил

Description

Brief description
В рамките на проекта се предвижда се да бъде изградена фотоволтаична инсталация за покриване на собствените нужди на сгради общинска собственост: 1. Общинска администрация, в с. Самуил - ФЕЦ до 40 kW, 2. ОУ „Христо Ботев“ с. Владимировци - ФЕЦ 30 kW, 3. ДГ „Радост“ с. Владимировци - ФЕЦ 10 kW, 4. СУ „Св. Св. Кирил и Методий“ с. Самуил - ФЕЦ 30 kW, 5. ДГ „Радост“, филиал на ДГ "Детелина", с.Здравец - ФЕЦ 40 kW, 6. ДГ „Радост“, филиал на ДГ "Детелина", с.Богданци - ФЕЦ 30 kW
Преобразуването на слънчева светлина в електрическа енергия е напълно екологичен процес, без отделяне на шум и вредни емисии. В проекта са предвидени фотоволтаични панели с различна пикова мощност според нуждите на обектите, съставени от монокристални клетки, с положителен толеранс на мощността, ефективност, температурен коефициент,  с висока устойчивост на вятър и повреди от градушка и отговарящи на стандарти IEC61215, IEC61730, IEC61701, IEC62716.
Избраният панел има 15 годишна продуктова гаранция и гарантиран добив след 25- тата година на експлоатация от 84,8%.
За преобразуването на постояннотоковата енергия в променливотокова са предвидени и инвертори. Инверторите са с максимална ефективност и възможност за отдалечен мониторинг, интегрирани прекъсвачи и пренапрежителни арестори на постояннотокова и променливотокова страна, клас на защита IP65 и максимално входящо напрежение, съответстващо на това на фотоволтаичните панели. Инверторите, също така, имат възможност за работа с батерии, които ще се поставят на всеки обект.
Електроинсталационните материали, които ще се използват при изпълнение на проекта като фотоволтаични модули, инвертори, батерии, ел. апарати, кабели, както и принадлежностите към тях трябва да отговарят на изискванията на БДС и при доставка да бъдат придружени със съответните сертификати и декларации за съответствие.
Activities
  • Activity: СМР по проект: "Повишаване на енергийната ефективност на сгради общинска собственост в Община Самуил": В рамките на проекта се предвижда се да бъде изградена фотоволтаична инсталация за покриване на собствените нужди на сгради общинска собственост: 1. Общинска администрация, в с. Самуил - Фотоелектрическа централа до 40 kW, 2. ОУ „Христо Ботев“ с. Владимировци - Фотоелектрическа централа 30 kW, 3. ДГ „Радост“ с. Владимировци - Фотоелектрическа централа 10 kW, 4. СУ „Св. Св. Кирил и Методий“ с. Самуил - Фотоелектрическа централа 30 kW, 5. ДГ „Радост“, филиал на ДГ "Детелина", с.Здравец - Фотоелектрическа централа 40 kW, 6. ДГ „Радост“, филиал на ДГ "Детелина", с.Богданци - Фотоелектрическа централа 30 kW, Contracted Amount: 475 327.90 , Reported Amount: 482 335.13
  • Activity: Консултантски услуги за управлението на проект: "Повишаване на енергийната ефективност на сгради общинска собственост в Община Самуил": Изборът на консултант за предоставяне на Консултантските услуги за управление на проекта ще се извърши съгласно нормативните изисквания на Закона за обществените поръчки /ЗОП/ и Правилника за неговото приложение. Подборът на изпълнител чрез провеждането на обществени поръчки ще гарантира прозрачността на избора и спазването на принципите на равнопоставеност между участниците, безпристрастност и равно третиране на кандидатите. Също така ще позволи да се получат икономически най-изгодните оферти, съчетаващи високо качество и оптимална цена., Contracted Amount: 4 752.46 , Reported Amount: 4 736.50

Participating Organizations

Partners None
Contractors
  • Contractor: PRO ECO DESIGN LTD, Contracted Amount*: 6 629.01 , Reported Amount**: 6 629.01
  • Contractor: LEXANI LTD, Contracted Amount*: 9 798.29 , Reported Amount**: 9 473.00
  • Contractor: Samp;B ENERGYCONSULT LTD, Contracted Amount*: 2 368.25 , Reported Amount**: 2 368.25
  • Contractor: TABAK COM ENGINEERING LTD, Contracted Amount*: 473 650.16 , Reported Amount**: 468 601.37
Subcontractors None
Members of the Consortium None

Notes:

* The projected contract value may be lower than the reported one because of any of the following reasons:

  • For physical person, the contracted value does not include the employer expenses, which are admissible expenses and are accounted under the project
  • The Beneficiary has reported expense only with an invoice without a contract with the selected contractor
  • The beneficiary has reported over again expenses to the MA

** This column represents the amount of costs claimed by the beneficiary

Indicators

None

Financial Information

Total Project cost 486 920.12 EUR
Grant 486 920.12 EUR
Self amount 0.00 EUR
Total actual amounts paid 733 131.84 EUR
Percentage of EU co-financing 85.00 %

Financial Corrections

None

Notes:

1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower.

2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment.

Procurements

Procedure 1 Subject to due process: Избор на изпълнител за осъществяване на Консултантски услуги по управление на проект: "Повишаване на енергийната ефективност на сгради общинска собственост в Община Самуил", Estimated Amount: 4 752.46
Procedure 2 Subject to due process: Избор на изпълнител за СМР по проект: "Повишаване на енергийната ефективност на сгради общинска собственост в Община Самуил", Estimated Amount: 475 327.90
  • Differentiated position 1: ОП № 1: Повишаване на Енергийната ефективност на сградата на Общинска администрация, в с. Самуил, ул. „Хаджи Димитър“ №2 , чрез изграждане на Фотоволтаична електрическа централа до 40 kW;
    Contractor: TABAK COM ENGINEERING LTD
    Contract total funded value: 102 133.04
  • Differentiated position 2: ОП № 2: Повишаване на Енергийната ефективност на сградата на ОУ „Христо Ботев“ с. Владимировци, ул. „Христо Ботев“ №1, чрез изграждане на Фотоволтаична електрическа централа 30 kW;
    Contractor: TABAK COM ENGINEERING LTD
    Contract total funded value: 80 035.49
  • Differentiated position 3: ОП № 3: Повишаване на Енергийната ефективност на сградата на Детска градина „Радост“, с.Владимировци, ул. “Христо Ботев“ №2, чрез изграждане на Фотоволтаична електрическа централа 10 kW;
    Contractor: TABAK COM ENGINEERING LTD
    Contract total funded value: 29 277.61
  • Differentiated position 4: ОП № 4: Повишаване на Енергийната ефективност на сградата на СУ „Св. Св. Кирил и Методий“ с. Самуил, ул. „Черни връх №25, чрез изграждане на Фотоволтаична електрическа централа 30 kW
    Contractor: TABAK COM ENGINEERING LTD
    Contract total funded value: 80 035.49
  • Differentiated position 5: ОП № 6: Повишаване на Енергийната ефективност на сградата на Детска градина „Радост“, филиал на ДГ „Детелина“, с.Богданци, ул. „Георги Бенковски“ №19, чрез изграждане на Фотоволтаична електрическа централа 30 kW
    Contractor: TABAK COM ENGINEERING LTD
    Contract total funded value: 80 035.49
  • Differentiated position 6: ОП № 5: Повишаване на Енергийната ефективност на сградата на Детска градина „Радост“, филиал на ДГ „Детелина“, с.Здравец, ул. „Гео Милев“ №68, чрез изграждане на Фотоволтаична електрическа централа 40 kW
    Contractor: TABAK COM ENGINEERING LTD
    Contract total funded value: 102 133.04

Notes:

All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN