Identification

UMIS Number BG-RRP-4.020-0259-C01
Project Name Introduction of energy efficiency measures in the building of the "Hristo Botev - 1918" Community Center, Smochevo village, Rila Municipality
Beneficiary 000261598 OBSHTINA RILA
Funding RRF ==> Recovery and Resilience Plan
Date of the Contract/Order 25.04.2024
Start Date 25.04.2024
End Date 30.06.2026
Status of Implementation of the Contract/Order of the Grant In execution (starting date)
Location of Performance
  • България, Югозападна и южно-централна България (BG4), Югозападен (BG41), Кюстендил (BG415), Рила, с.Смочево

Description

Brief description
Предложението за изпълнение на инвестицията предвижда  мерки за енергийно обновяване на  сградата на Читалище "Христо Ботев - 1918" с. Смочево, Община Рила и ще допринесе за постигане на енергийно ефективно обновяване на сграда, чрез прилагане на високоефективни енергийни мерки; намаляване на разходите за енергопотребление, което ще доведе и до спестяване на публичен ресурс; подобряване на условията в сградите. В резултат на предвидените дейности се очаква енергийно обновена сграда – италище "Христо Ботев - 1918" с. Смочево, Община Рила, да постигне на минимум 30 % от спестяванията на първична енергия на сградата, достигане на клас на енергопотребление минимум „B“ след прилагане на енергоспестяващи мерки, подобряване на експлоатационните характеристики за удължаване на жизнения цикъл на сградата.
Activities
  • Activity: Изпълнение на строително монтажни работи за прилагане на мерки за енергийна ефективност: Извършване на строително монтажни работи за прилагане на мерки за енергийна ефективност във връзка с изпълнението на проект: Въвеждане на мерки за енергийна ефективност в сградата на Читалище "Христо Ботев - 1918" с. Смочево, Община Рила, Contracted Amount: 590 450.54 , Reported Amount: 0.00
  • Activity: Осъществяване на строителен надзор оценка за съответствие.: Избор на изпълнител за упражняване на строителен надзор и оценка за съответсвие по време на изпълнение на строително - монтажните работи за проект: Въвеждане на мерки за енергийна ефективност в сградата на Читалище "Христо Ботев - 1918" с. Смочево, Община Рила, Contracted Amount: 12 600.00 , Reported Amount: 0.00
  • Activity: Организация и управление и за информация и публичност : Проведена е обществена поръчка по реда на чл. 20, ал. 4 т. 3 от ЗОП - Директно възлагане, в резултат на което е сключен Договор № 34/26.04.2023г. между Община Рила и "Мунин Инженеринг" ООДс предмет "Предоставяне на консултантски услуги за организация и управление, и информация и публичност по време на изпълнение на проект Въвеждане на мерки за енергийна ефективност в сградата на Читалище "Христо Ботев - 1918" с. Смочево, Община Рила"., Contracted Amount: 9 849.26 , Reported Amount: 0.00
  • Activity: Проектиране и авторски надзор: Проведена е обществена поръчка по реда на чл. 20, ал. 4 т. 3 от ЗОП - Директно възлагане, в резултат на което е сключен Договор № 36/26.04.2023г. между Община Рила и "Архитектурно студио Чангулев" ЕООД с предмет "Изработване на инсвестиционен проект и осъществяване на авторски надзор на обект "Въвеждане на мерки за енергийна ефективност в сградата на Читалище "Христо Ботев - 1918" с. Смочево, Община Рила". Изготвен е Технически проект на обекта предмет на инвестицията. При възлагане на извършването на СМР, ще бъде осъществяван авторски надзор по всички части на проекта. Авторският надзор ще е с продължителност - до приемане на всички дейности по СМР съгласно действащото законодателство (Акт образец 15 и/или Въвеждане в експлоатация), Contracted Amount: 20 040.00 , Reported Amount: 0.00
  • Activity: Разходи за изготвяне на обследване за ЕЕ и сертификат за ЕЕ, разходи за ТО и технически паспорт: Извършено е енергийно обследване на сградата на Читалище "Христо Ботев - 1918" с. Смочево, Община Рила от изпълнител - "ТИЙМ ЕКПЕТРТС" ООД, притежаващ необходимите изискуеми се сертификати, в резултат на директно възлагане от страна на Община Рила по чл. 20, ал. 4, т. 3 във връзка с ал. 5 от ЗОП. Проведена е обществена поръчка по реда на чл. 20, ал. 4 т. 3 от ЗОП - Директно възлагане, в резултат на което е сключен Договор № 35/26.04.2023г. между Община Рила и "ДИД - Консулт инжинеринг груп" ЕООД с предмет "Изготвяне на технически паспорт на сградата на читалище Христо Ботев 1918 с. Смочево, община Рила". В резултат на което е изготвен технически паспорт за обекта предмет на инвестицията., Contracted Amount: 7 320.00 , Reported Amount: 0.00
  • Activity: Разходи за изготвяне на независима експертна оценка.: Разходи за изготвяне на независима експертна оценка за постигнатите показатели след извършените енергийно спестяващи дейности в следствие на реализираните СМР на обекта., Contracted Amount: 6 000.00 , Reported Amount: 0.00
  • Activity: Въвеждането на обекта в експлоатация: След приключване на СМР за обекта, ще се извърши въвеждане на същия съгласно действащото приложимо законодателство. , Contracted Amount: 3 600.00 , Reported Amount: 0.00

Participating Organizations

Partners None
Contractors
  • Contractor: "Munin Engineering" Ltd, Contracted Amount*: 9 849.26 , Reported Amount**: 0.00
  • Contractor: DID-Consult Engineering Group, Contracted Amount*: 3 000.00 , Reported Amount**: 0.00
  • Contractor: TEAM EXPERTS, Contracted Amount*: 4 320.00 , Reported Amount**: 0.00
  • Contractor: ARCHITECTURAL STUDIO CHANGULEV, Contracted Amount*: 20 040.00 , Reported Amount**: 0.00
Subcontractors None
Members of the Consortium None

Notes:

* The projected contract value may be lower than the reported one because of any of the following reasons:

  • For physical person, the contracted value does not include the employer expenses, which are admissible expenses and are accounted under the project
  • The Beneficiary has reported expense only with an invoice without a contract with the selected contractor
  • The beneficiary has reported over again expenses to the MA

** This column represents the amount of costs claimed by the beneficiary

Indicators

Indicator 1 Намаляване на емисиите на парникови газове, Measure Unit: тонове CO2 екв., Base Value: 0.00 , Target amount: 45.81 , Reached amount: 0.00
Indicator 2 Completed energy-efficiency renovation of non- residential buildings – renovated surface of public buildings (sub-measure 2), Measure Unit: m2, Base Value: 0.00 , Target amount: 1 043.76 , Reached amount: 0.00
Indicator 3 Reduction of annual primary energy consumption, Measure Unit: kWh/година, Base Value: 0.00 , Target amount: 216 818.98 , Reached amount: 0.00
Indicator 4 Completed energy renovation of non-residential buildings – number of renovated buildings (sub-measures 2 and 3), Measure Unit: Брой, Base Value: 0.00 , Target amount: 1.00 , Reached amount: 0.00

Financial Information

Total Project cost 649 859.80 BGN
Grant 600 804.88 BGN
Self amount 49 054.92 BGN
Total actual amounts paid 0.00 BGN
Percentage of EU co-financing 83.33 %

Financial Corrections

None

Notes:

1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower.

2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment.

Procurements

Procedure 1 Subject to due process: "Избор на изпълнител за извършване на строително - монтажни работи за проект: Въвеждане на мерки за енергийна ефективност в сградата на Читалище "Христо Ботев - 1918" с. Смочево, Община Рила, Estimated Amount: 590 450.54
Procedure 2 Subject to due process: Избор на изпълнител за упражняване на Строителен надзор по време на изпълнение на строително - монтажните работи за проект: Въвеждане на мерки за енергийна ефективност в сградата на Читалище "Христо Ботев - 1918" с. Смочево, Община Рила, Estimated Amount: 12 600.00
Procedure 3 Subject to due process: Изготвяне на енергийно обследване и сертифициране на сградата на читалище "Христо Ботев -1918" , с. Смочево, Община Рила по изискванията на Насоките за кандидатстване за предоставяне на средства чрез подбор на предложения за изпълнение на инвестиции по Процедура BG-RPP-4.020 "Подкрепа за устойчиво енергийно обновяване на публичен сграден фонд за административно обслужване, култура и спорт", с финансиране по линия на Механизма за възстановяване и устойчивост. , Estimated Amount: 3 600.00
  • Differentiated position 1: Изготвяне на енергийно обследване и сертифициране на сградата на читалище "Христо Ботев -1918" , с. Смочево, Община Рила по изискванията на Насоките за кандидатстване за предоставяне на средства чрез подбор на предложения за изпълнение на инвестиции по Процедура BG-RPP-4.020 "Подкрепа за устойчиво енергийно обновяване на публичен сграден фонд за административно обслужване, култура и спорт", с финансиране по линия на Механизма за възстановяване и устойчивост
    Contractor: TEAM EXPERTS
    Contract total funded value: 4 320.00
Procedure 4 Subject to due process: Изготвяне на технически паспорт на сградата на Читалище "Христо Ботев-1918" с. Смочево, Община Рила по изискванията на Насоките за кандидатстване за предоставяне на средства чрез подбор на предложения за изпълнение на инвестиции по Процедура BG-RPP-4.020 "Подкрепа за устойчиво енергийно обновяване на публичен сграден фонд за административно обслужване, култура и спорт", с финансиране по линия на Механизма за възстановяване и устойчивост. , Estimated Amount: 2 500.00
  • Differentiated position 1: Изготвяне на технически паспорт на сградата на Читалище "Христо Ботев-1918" с. Смочево, Община Рила по изискванията на Насоките за кандидатстване за предоставяне на средства чрез подбор на предложения за изпълнение на инвестиции по Процедура BG-RPP-4.020 "Подкрепа за устойчиво енергийно обновяване на публичен сграден фонд за административно обслужване, култура и спорт", с финансиране по линия на Механизма за възстановяване и устойчивост.
    Contractor: DID-Consult Engineering Group
    Contract total funded value: 3 000.00
Procedure 5 Subject to due process: Изработване на инвестиционен проект и осъществяване на авторски надзор на обект "Въвеждане на мерки за енергийна ефективност в сградата на Читалище "Христо Ботев -1918" с. Смочево, община Рила, по Процедура BG-RPP-4.020 "Подкрепа за устойчиво енергийно обновяване на публичен сграден фонд за административно обслужване, култура и спорт", с финансиране по линия на Механизма за възстановяване и устойчивост. , Estimated Amount: 16 700.00
  • Differentiated position 1: Изработване на инвестиционен проект и осъществяване на авторски надзор на обект "Въвеждане на мерки за енергийна ефективност в сградата на Читалище "Христо Ботев -1918" с. Смочево, община Рила, по Процедура BG-RPP-4.020 "Подкрепа за устойчиво енергийно обновяване на публичен сграден фонд за административно обслужване, култура и спорт", с финансиране по линия на Механизма за възстановяване и устойчивост.
    Contractor: ARCHITECTURAL STUDIO CHANGULEV
    Contract total funded value: 20 040.00
Procedure 6 Subject to due process: Предметът на предвидената процедура е Предоставяне на консултантски услуги за организация и управление, и информация и публичност по време на изпълнение на проект "Въвеждане на мерки за енергийна ефективност в сградата на Читалище "Христо Ботев -1918" с. Смочево, община Рила, по Процедура BG-RPP-4.020 "Подкрепа за устойчиво енергийно обновяване на публичен сграден фонд за административно обслужване, култура и спорт", с финансиране по линия на Механизма за възстановяване и устойчивост. , Estimated Amount: 10 000.00
  • Differentiated position 1: Предоставяне на консултантски услуги за организация и управление, и информация и публичност по време на изпълнение на проект "Въвеждане на мерки за енергийна ефективност в сградата на Читалище "Христо Ботев -1918" с. Смочево, община Рила, по Процедура BG-RPP-4.020 "Подкрепа за устойчиво енергийно обновяване на публичен сграден фонд за административно обслужване, култура и спорт", с финансиране по линия на Механизма за възстановяване и устойчивост.
    Contractor: "Munin Engineering" Ltd
    Contract total funded value: 9 849.26

Notes:

All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN