UMIS Number | BG-RRP-9.001-0001-C01 |
Project Name | Programme for the construction/completion/reconstruction of water supply and sewerage systems, including waste water treatment plants for agglomerations between 5 000 and 10 000 population equivalent |
Beneficiary | 206086428 Bulgarian W&S holding EAD |
Funding | RRF ==> Recovery and Resilience Plan |
Date of the Contract/Order | 26.03.2024 |
Start Date | 01.01.2023 |
End Date | 30.06.2026 |
Status of Implementation of the Contract/Order of the Grant | In execution (starting date) |
Location of Performance |
|
Brief description |
Oсигуряване на средства по Програма за изграждане/доизграждане/реконструкция на водоснабдителни и канализационни системи, вкл. и пречиствателни станции за отпадъчни води за агломерациите между 5000 и 10 000 е. ж. |
Activities |
|
Partners |
|
Contractors |
|
Subcontractors | None |
Members of the Consortium | None |
Notes: * The projected contract value may be lower than the reported one because of any of the following reasons:
** This column represents the amount of costs claimed by the beneficiary |
Indicator 1 | Award of contracts for the design and construction of the wastewater treatment plants and the water supply and sewerage network, Measure Unit: Брой, Base Value: 0.00 , Target amount: 0.00 , Reached amount: 0.00 |
Indicator 2 | Newly built / reconstructed water supply network connected to newly built/reconstructed waste water treatment plants, Measure Unit: километри, Base Value: 0.00 , Target amount: 250.00 , Reached amount: 0.00 |
Total Project cost | 351 175 981.81 BGN |
Grant | 300 000 000.00 BGN |
Self amount | 51 175 981.81 BGN |
Total actual amounts paid | 0.00 BGN |
Percentage of EU co-financing | 100.00 % |
None | |
Notes: 1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower. 2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment. |
Procedure 1 |
Subject to due process: Изготвяне по заявка на Възложителя на проекти на документации за провеждане на открити процедури по реда на ЗОП и създаване на електронни преписки на процедурите в Централизираната автоматизирана информационна система (ЦАИС ЕОП), включително попълване на проект на решение за откриване на процедурата и проект на обявление на поръчката, за нуждите на проект C9.I1 "Програма за изграждане/доизграждане/реконструкция на водоснабдителни и канализационни системи, вкл. и пречиствателни станции за отпадъчни води за агломерациите между 5 000 и 10 000 е.ж." в рамките на Националния план за въстановяване и устойчивост (НПВУ),
Estimated Amount: 25 000.00
|
Notes:
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN