Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 57 550 TREES
Български

Programme: Environment

Planning region: All

Financial Information

14 305 450.21 BGN
12 688 756.48 BGN
1 616 693.73 BGN
12 688 825.86 BGN
85.00 %
{point.key}
{point.value}
{point.key}

Financial Corrections

Reason % of financial
correction
Financial corrections amounts1,2 Contract
Grant Self-financing Total
Нарушения в документацията за обществени поръчки 5.00 1 645.38 209.62 1 855.00 Nevin
Нарушения в документацията за обществени поръчки** 5.00 530 979.27 67 644.48 598 623.75 DZZD KA Aytos
Нарушения в документацията за обществени поръчки** 10.00 149 338.50 19 025.08 168 363.58 DZZD Vodokanal Aytos 2017
Нарушаване на правилата за държавната помощ 5.00 10 111.80 1 288.20 11 400.00 DZZD KONSULTANTI A-21
Нарушения в документацията за обществени поръчки 5.00 2 306.20 293.80 2 600.00 ATI KONSULT EOOD
Нарушения в документацията за обществени поръчки 5.00 10 392.67 1 323.98 11 716.65 DZZD TRANS-ER
Нарушения в документацията за обществени поръчки 25.00 5 532.38 625.16 6 157.54 Nevin

Notes:

* The amount of the actual amounts paid cumulative
** The beneficiary disputes the financial correction in court in accordance with the Administrative Procedure Code.
1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower.
2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment.
Elements in light blue allow detailed view when selected
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).