Identification

UMIS Number BG16RFOP001-2.001-0179-C01
Project Name Implementation of energy efficiency measures in multifamily residential buildings in Sevlievo city.
Beneficiary 000215889 Municipality Sevlievo
Funding ERDF ==> Regions in Growth
Date of the Contract/Order 24.11.2016
Start Date 24.11.2016
End Date 09.04.2019
Status of Implementation of the Contract/Order of the Grant Closed (completion date)
Location of Performance
  • България, Северна и югоизточна България, Северен централен, Габрово, Севлиево, гр.Севлиево

Description

Brief description
Прилагане на всички допустими за финансиране с БФП задължителни енергоспестяващи мерки предписани в обследването за ерегийна ефективност и техническото обследване за постигане на най-малко клас „С“ енергопотребление на двадесет и три многофамилни жилищни сгради на територията на град Севлиево, като се цели да се повиши енергийната ефективност на сградите и намаляване на разходите за енергия, подобряване на експлоатационните характеристики за удължаване на жизнения цикъл на сградите, осигуряване на условия на жизнена среда в съответствие с критериите за устойчиво развитие. В съответствие с Насоките за кандидатстване по процедурата, проектното предложение предвижда следните дейности: Проектиране - изготвяне на инвестиционни проекти на двадесет и три многофамилни жилищни сгради, обект на интервенция на база задължителните мерки от направените в процеса на подготовка енергийно и техническо обследване на сградите; Строително-монтажни работи за въвеждане на енергоефективни мерки; Осъществяване на авторски и строителен надзор; Осъществяване на дейности по информация и публичност; Осъществяване на дейности по одит и Организация и управление на изпълнение на предвидените дейности.
Реализацията на проектното предложение ще допринесе за подобряване на жизнената среда на 294 домакинства и ще подобри експлоатационните характеристики за удължаване на жизнения цикъл на сградите. В съответствие с хоризонталните политики на ЕС, проекта ще допринесе до изпълнение на политиките на местно и национално ниво в областта на рационално използване на енергийните ресурси и опазване на околната среда.
Activities
  • Activity: Организация и управление: Целта на дейността е качествено изпълнение и управление на проекта - навременно осъществяване на проектните дейности, ефективна работна организация при реализацията и успешното му приключване. Със заповед на Кмета на общината ще бъде сформиран екип за управление на проекта, който ще изпълнява задълженията си по проекта почасово, както следва: - Ръководителят на проекта ще изпълнява задълженията си до 80 часа/месечно, като организира и координира цялостното изпълнение на дейностите по проекта; - Юристът ще изпълнява задълженията си до 80 часа/месечно, като осъществява юридически консултации по въпроси, свързани с дейностите по проекта; - Счетоводителя по проекта ще изпълнява задълженията си до 80 часа/месечно , като контролира правилното разходване на средствата по Проекта, в рамките на предвидения бюджет и създава организация на счетоводния процес, която да осигури навременно и точно осчетоводяване на документи. - Координатора ще изпълнява задълженията си до 80 часа/месечно, като координира дейността на екипа за управление на проекта, подпомага ръководителя на проекта при изпълнение на неговите задължения и следи и отговаря за спазване на изискванията за публичност и визуализация на Управляващия орган при разработването и разпространението на всички продукти в рамките на проекта; - Специалист "Инвеститорски контрол" ще изпълнява задълженията си до 8 часа/ден, като оказва необходимата подкрепа и съдействие при определянето, подготовката, възлагането, изпълнението и отчитането на дейностите, попадащи в обхвата на проекта - в това число подготвя справки, отчети, становища и др. документи по компетентност; - Предвид броя на обектите на интервенция и с цел качествено изпълнение на дейностите по проекта са заложени двама технически сътрудници: Технически сътрудник 1 ще изпълнява задълженията си до 80 часа/месечно, като ще отговаря за отчитане изпълнение на дейностите по проекта, ще води архива на проекта и ще изготвя и подава необходимата информация в ИСУН и ИСУП. Технически сътрудник 2, ще изпълнява задълженията си до 8 часа/ден като координира, наблюдава чрез ежедневни посещения на място всички обекти на интервенция и съвместно с инвеститорския контрол ще извършва проверка на актовете в строителството. Той ще следи работата на изпълнителите по проекта по отношение на СМР и в техническото изпълнение на проекта, ще подпомага Технически сътрудник 1 в отчитането на дейностите по проекта. Ще се разпределят задачите и отговорностите между членовете на екипа, ще бъде актуализиран и детайлизиран план-графикът по проекта, подготовка за изпълнението на основните дейности по проекта, чрез изготвянето на документация и възлагане на обществените поръчки. Екипът за организация и изпълнение на проекта ще спазва клаузите на Договора за безвъзмездна финансова помощ, както и всички указания и изисквания, разработени и предоставени от Управляващия орган, както при подписване на договора, така и в процеса на неговата реализация. Всички членове на екипа ще спазват изискванията за поверителност и конфиденциалност, предотвратяване конфликт на интереси, кодекса за етично поведение и всички вътрешни правила, свързани с изпълнението на проекти. Екипът ще отговорен за подготовката на документацията за избор на изпълнители съгласно ЗОП., Contracted Amount: 75 485.71 , Reported Amount: 65 908.06
  • Activity: Осъществяване на дейности по информация и публичност: Дейността предвижда изпълнение на дейности по информация и публичност на проекта в съответствие с изискванията за Единния наръчник на бенефициента за прилагане на правилата информация и комуникация 2014-2020. Предвидено е да бъдат монтирани два билборда, като след приключване на проекта билбордовете ще бъдат заменени с две постоянни обяснителни табели. С цел информиране на обществеността за приноса на ЕС и държавата във всяка от сградите на интервенция ще бъде поставен плакат. Предвидени са организиран и провеждане на две публични събития - пресконференция при стартиране и приключване на дейностите по проекта. Планирано е да се организират и проведат две официални церемонии: церемония "Първа копка" - при стартирането на строителните дейности и официална церемония след тяхното приключване. В интернет - страницата на община Севлиево в секция проекти ще бъде поставена информация за хода на изпълнение на проекта, ще бъде поместена и информация за подписването на договора за БФП, стартирането на дейностите по проекта, както и за приключването на проекта. С цел информиране на обществеността за получената подкрепа Европейския фонд за регионално развитие и държавния бюджет на Р България. След приключването на строителните дейности върху фасадата на подходящо място ще бъдат поставени 23 постоянни обяснителни табели., Contracted Amount: 21 471.04 , Reported Amount: 25 765.24
  • Activity: Осъществяване на дейности по одит: В съответствие с насоките кандидатстване ще бъде избран квалифициран одитор за изготвяне на доклад за фактически констатации (финансов одит) към окончателното искане за плащане, като ангажимент за договорени процедури по проекта. Докладът ще бъдат изготвен в хода на подготовка на окончателното искане за средства и ще бъде приложен към същия. Доклада ще обхваща проверка на извършените разходи по отношение на действителност, точност и допустимост в съответствие с договора за БФП., Contracted Amount: 25 000.00 , Reported Amount: 30 000.00
  • Activity: Строителен надзор и оценка на съответствието, съгласно ЗУТ: Дейността предвижда оценка на съответствието на изготвените в резултат на процедура по инженеринг работни проекти за енергийна ефективност, упражняване на строителен надзор, координация по безопасност и здраве и изготвяне на технически паспорт на сградите обект на интервенция съгласно изискванията на ЗУТ. Избраният за изпълнител ще извършва надзорни и контролни дейности, съгласно действащите нормативни документи в Република България. Ще проверява качеството и количеството на извършеното строителство. Ще отчита ефекта от него и ще следи за възникване на конфликт на интереси, като при появата на такива ще сигнализира своевременно. Ще контролира документооборота с цел избягване на всякакви злоупотреби и незаконни действия. Според спецификата на предложените дейности независимият строителен надзор ще започне своята дейност паралелно с изготвянето на инвестиционните проекти. Негово задължение ще бъде и откриването на строителна площадка, изготвянето и съгласуването на заповедна книга за обекта. Той ще присъства на извършването и ще документира всички видове скрити работи с цел доказване на направените разходи, за което ще издава необходимите актове. За да се избегне конфликт на интереси, тези актове ще се подписват и от член на екипа по управление на проекта или от изрично упълномощено от кмета на общината лице. За напредъка на работата и спазването на заложените в договора срокове, надзорникът ще съставя доклади. При приключване на обекта, независимият строителен надзор ще представи окончателен доклад, според изискванията на ЗУТ., Contracted Amount: 83 333.33 , Reported Amount: 26 119.20
  • Activity: Проектиране, строителство и авторски надзор: Дейността предвижда осъществяване на дейности по инженеринг - проектиране, строителство и авторски надзор на обектите на интервенция. За целите на изпълнение на дейността ще бъде избрани външни изпълнители, които на база изготвените технически и енергийни обследвания ще изготвят технически проект за всеки отделен обект на интервенция с обхват и съдържание съгласно нормативните изисквания на Наредба №4/2001 г. за обхвата и съдържанието на инвестиционните проекти, Наредба № 7 / 15.12.2004 г. за енергийна ефективност на сгради, изм. – ДВ, бр. 90 от 20.112015 г., а така също и специфичните изисквания за всеки обект на интервенция. В обяснителните записки проектантите следва подробно да опишат необходимите изходни данни, дейности, технико-икономически показатели, спецификация на предвидените за влагане строителни продукти (материали, изделия, комплекти) с технически изисквания към тях в съответствие с действащи норми и стандарти и технология на изпълнение, количествени и стойностни сметки. Техническите проекти ще бъдат надлежно съгласувани и одобрен по реда на ЗУТ. В дейността се предвижда осигуряване на изходни данни за проектирането, одобряване на инвестиционните проекти от компетентните органи и издаване на разрешение за строеж. Техническото изпълнение на строителството ще включва: За сградите с под 60% енергийни спестявания: - изпълнение на всички енергоспестяващи мерки, които са предписани като задължителни за сградите в обследванията за енергийна ефективност и които водят до най - малко клас на енергопотребление "С"; - изпълнение на мерки по конструктивно възстановяване/усилване, които са предписани като задължителни в техническите обследвания на сградите (съгласно техническите паспорти на сградите, част Б "Мерки за поддържане на строежа и срокове за извършване на ремонти", т.2 "Необходими мерк иза поддържане за безопастна експлоатация на строежа и график за изпълнение на неотложните мерки"); - изпълнение на мерки, свързани с подобряването на достъпа за лица с увреждания до сградите в съответствие с Наредба4 от 01.07.2009 г. за проектиране, изпълнение и поддържане на строежите в съответствие с изискванията за достъпна среда за населението, включително за хора с увреждания и съгласно въпросите и отговорите по процедурата. За сградите с над 60% енергийни спестявания: - изпълнение на всички енергоспестяващи мерки, които са предписани като задължителни за сградите в обследванията за енергийна ефективност и които водят до най - малко клас на енергопотребление "С"; - изпълнение на мерки по конструктивно възстановяване/усилване, които са предписани като задължителни в техническите обследвания на сградите (съгласно техническите паспорти на сградите, част Б "Мерки за поддържане на строежа и срокове за извършване на ремонти", т.2 "Необходими мерк иза поддържане за безопастна експлоатация на строежа и график за изпълнение на неотложните мерки"); - изпълнение на останалите мерки, които са предписани като задължителни в техническите обследвания; - изпълнение на мерки, свързани с подобряването на достъпа за лица с увреждания до сградите в съответствие с Наредба4 от 01.07.2009 г. за проектиране, изпълнение и поддържане на строежите в съответствие с изискванията за достъпна среда за населението, включително за хора с увреждания и съгласно въпросите и отговорите по процедурата. Дейностите по авторски надзор ще бъдат осигурени от проектанти по всяка част на техническия проект с цел точното спазване на инвестиционните проекти при изпълнението на СМР. Изпълнителите посредством отделни правоспособни лица, ще осъществят авторски надзор съобразно изискванията на чл. 162 от ЗУТ и договора за изпълнение. С осъществяването на надзор от проектантите – автори на отделни части на технически проект ще се гарантира точното изпълнение на проекта, спазването на архитектурните, технологичните и строителните правила и норми, както и подготовката на проектната документация за въвеждане на обекта в експлоатация., Contracted Amount: 3 599 727.33 , Reported Amount: 4 294 156.03
  • Activity: Въвеждане на обектите в експлоатация: Установяване на функционалната пригодност за ползване, съобразно издадените строителни книжа на сградите на 23 обекта., Contracted Amount: 30 507.41 , Reported Amount: 0.00

Participating Organizations

Partners None
Contractors
  • Contractor: Silviya, Contracted Amount*: 14 400.00 , Reported Amount**: 0.00
  • Contractor: DZZD DK – Consult, Contracted Amount*: 11 781.72 , Reported Amount**: 12 272.11
  • Contractor: BIBO 69 EOOD, Contracted Amount*: 1 776 687.11 , Reported Amount**: 1 776 203.44
  • Contractor: Kalina, Contracted Amount*: 21 428.57 , Reported Amount**: 0.00
  • Contractor: Storm Odit LTD, Contracted Amount*: 30 000.00 , Reported Amount**: 30 000.00
  • Contractor: Arhkon Project Limited Liability Company, Contracted Amount*: 6 441.63 , Reported Amount**: 8 052.05
  • Contractor: Svetla, Contracted Amount*: 7 200.00 , Reported Amount**: 0.00
  • Contractor: Multiplex Engineering Consortium - Life Energy, Contracted Amount*: 6 813.56 , Reported Amount**: 8 516.95
  • Contractor: Diyana, Contracted Amount*: 7 200.00 , Reported Amount**: 0.00
  • Contractor: Stefka, Contracted Amount*: 12 571.43 , Reported Amount**: 0.00
  • Contractor: DZZD CERB EAD-ARTIS LTD, Contracted Amount*: 1 325 244.00 , Reported Amount**: 1 322 852.95
  • Contractor: Violeta, Contracted Amount*: 4 685.71 , Reported Amount**: 0.00
  • Contractor: Sinko Engineering Joined Stock Company, Contracted Amount*: 19 309.88 , Reported Amount**: 24 137.35
  • Contractor: Energy Survey Consortium , Contracted Amount*: 13 514.40 , Reported Amount**: 16 893.00
  • Contractor: Tanya, Contracted Amount*: 7 200.00 , Reported Amount**: 0.00
  • Contractor: Stroicomerce LTD, Contracted Amount*: 1 095 720.00 , Reported Amount**: 1 098 305.59
  • Contractor: "ALFA-M-RUBICON", Contracted Amount*: 26 119.20 , Reported Amount**: 26 119.20
  • Contractor: Mega Build Ltd, Contracted Amount*: 12 510.24 , Reported Amount**: 15 637.80
  • Contractor: "ADASA 7"LTD, Contracted Amount*: 25 765.24 , Reported Amount**: 25 765.24
  • Contractor: VML Consult Ltd, Contracted Amount*: 9 043.41 , Reported Amount**: 11 304.26
  • Contractor: Petar, Contracted Amount*: 8 000.00 , Reported Amount**: 0.00
Subcontractors
  • Subcontractor: "GAL KOMERS" Ltd, Contracted Amount*: 0.00
  • Subcontractor: VIVA PROJECT EOOD, Contracted Amount*: 0.00
Members of the Consortium
  • Member of the Consortium: "ALFA-M 98", Contracted Amount*: 0.00
  • Member of the Consortium: "RUBICON ENGINEERING"Ltd, Contracted Amount*: 0.00
  • Member of the Consortium: Artis LTD, Contracted Amount*: 0.00
  • Member of the Consortium: CENTRALNA ENERGOREMONTNA BAZA EAD, Contracted Amount*: 0.00

Notes:

* The projected contract value may be lower than the reported one because of any of the following reasons:

  • For physical person, the contracted value does not include the employer expenses, which are admissible expenses and are accounted under the project
  • The Beneficiary has reported expense only with an invoice without a contract with the selected contractor
  • The beneficiary has reported over again expenses to the MA

** This column represents the amount of costs claimed by the beneficiary

Indicators

Indicator 1 Number of households with improved energy consumption classification, Measure Unit: домакинства, Base Value: 0.00 , Target amount: 294.00 , Reached amount: 294.00
Indicator 2 Енергийна ефективност: Брой обновени сгради, Measure Unit: Брой, Base Value: 0.00 , Target amount: 23.00 , Reached amount: 23.00
Indicator 3 Estimated annual decrease of GHG, Measure Unit: тонове CO2 екв., Base Value: 0.00 , Target amount: 1 264.45 , Reached amount: 2 044.57

Financial Information

Total Project cost 4 134 541.23 BGN
Grant 4 134 541.23 BGN
Self amount 0.00 BGN
Total actual amounts paid 4 134 541.23 BGN
Percentage of EU co-financing 85.00 %

Financial Corrections

Reason % of financial
correction
Financial corrections amounts1,2 Contract
Grant Self-financing Total
Нарушения в документацията за обществени поръчки 25.00 1 741.80 0.00 1 741.80 Консорциум "Енергийно обследване"
Нарушения в документацията за обществени поръчки 25.00 1 636.80 0.00 1 636.80 Консорциум "Енергийно обследване"
Нарушения в документацията за обществени поръчки 10.00 934.36 0.00 934.36 СИНКО-ИНЖЕНЕРИНГ АД
Нарушения в документацията за обществени поръчки 10.00 996.62 0.00 996.62 СИНКО-ИНЖЕНЕРИНГ АД
Нарушения в документацията за обществени поръчки 5.00 54 786.00 0.00 54 786.00 СТРОЙКОМЕРС ЕООД
Нарушения в документацията за обществени поръчки 5.00 66 262.20 0.00 66 262.20 ДЗЗД "ЦЕРБ ЕАД-АРТИС ЕООД"
Нарушения в документацията за обществени поръчки 5.00 42 148.80 0.00 42 148.80 БИБО 69 ЕООД
Нарушения в документацията за обществени поръчки 5.00 46 685.55 0.00 46 685.55 БИБО 69 ЕООД

Notes:

1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower.

2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment.

Procurements

Procedure 1 Subject to due process: „Извършване на оценка за съответствие на работните проекти и упражняване на строителен надзор върху строително-монтажни работи във връзка с изпълнението на проект „Прилагане на мерки за енергийна ефективност в многофамилни жилищни сгради в град Севлиево“ по Оперативна програма „Региони в растеж“ 2014 – 2020“, и по Приоритетна ос 2: „Подкрепа за енергийна ефективност в опорни центрове в периферните райони“, по четири обособени позици , Estimated Amount: 83 333.33
  • Differentiated position 1: Обособена позиция № 1: Включва шест сгради с административен адрес: гр. Севлиево, ул. „Стефан Пешев” № 86А-88 гр. Севлиево, ул. „Стефан Пешев” № 103 А и Б гр. Севлиево, ул. „Никола Дабев” № 43-45 гр. Севлиево, ул. „Свети княз Борис І” № 11 гр. Севлиево, ул. „Стефан Пешев” № 46-48 гр. Севлиево, ул. „Иван Преснаков” № 4-6
    Contractor: "ALFA-M-RUBICON"
    Contract total funded value: 6 876.00
  • Differentiated position 2: Обособена позиция № 2: Включва шест сгради с административен адрес: гр. Севлиево, ул. „Петко Рачев Славейков” № 34 гр. Севлиево, ул. „Асен и Илия Пейкови” № 18-20 гр. Севлиево, ул. „Асен и Илия Пейкови” № 13-15 гр. Севлиево, ул. „Люляк” № 11 гр. Севлиево, ул. „Хаджи Димитър” № 4 гр. Севлиево, ж.к. „Д-р Атанас Москов” бл.1
    Contractor: "ALFA-M-RUBICON"
    Contract total funded value: 5 154.00
  • Differentiated position 3: Обособена позиция № 3: Включва шест сгради с административен адрес: гр. Севлиево, ул. „Видима” № 14-16-18 гр. Севлиево, ул. „Здравец” № 10, вх. А и Б гр. Севлиево, ул. „Здравец” № 6 гр. Севлиево, ул. „Асенова” № 33-35 гр. Севлиево, ул. „Мара Гидик” № 15 и ул.“В.Г.Ченчеви“ № 46А гр. Севлиево, ул. „Равна гора” №2
    Contractor: "ALFA-M-RUBICON"
    Contract total funded value: 7 860.00
  • Differentiated position 4: Обособена позиция № 4: Включва пет сгради с административен адрес: гр. Севлиево, ул. „Ален Мак” № 6 гр. Севлиево, ул. „Цар Симеон Велики” № 18-20 гр. Севлиево, ул. „Братя Бъкстон” № 12 гр. Севлиево, ул. „Стоян Бъчваров” № 1,3,5,7 гр. Севлиево, ул. „Неофит Рилски” № 25
    Contractor: "ALFA-M-RUBICON"
    Contract total funded value: 6 229.20
Procedure 2 Subject to due process: „Изготвяне на обследвания за установяване на техническите характеристики, свързани с изискванията по чл. 169, ал. 1 (т. 1 - 5) и ал. 2 от ЗУТ и съставяне на технически паспорт на съществуващ строеж и обследване за енергийна ефективност на сгради на територията на гр. Севлиево“, Estimated Amount: 130 000.00
  • Differentiated position 1: Обособена позиция №1 ,, Изготвяне на обследвания за установяване на техническите характеристики, свързани с изискванията по чл. 169, ал. 1 (т. 1 - 5) и ал. 2 от ЗУТ и съставяне на технически паспорт на съществуващ строеж и обследване за енергийна ефективност на сгради с административен адрес гр. Севлиево, ул. ,,Здравец №6, представляващ РЗП 1417,00 кв.м., и на сграда с административен адрес гр.Севлиево, ул.,,Стефан Пешев “№103 А и Б, представляващ РЗП1504,00 кв. м.
    Contractor: VML Consult Ltd
    Contract total funded value: 9 043.41
  • Differentiated position 2: Обособена позиция №2 ,, Изготвяне на обследвания за установяване на техническите характеристики, свързани с изискванията по чл. 169, ал. 1 (т. 1 - 5) и ал. 2 от ЗУТ и съставяне на технически паспорт на съществуващ строеж и обследване за енергийна ефективност на сгради с административен адрес гр. Севлиево, ул. ,,Равна гора"блок 2, представляващ РЗП 2880,00 кв.м.,
    Contractor: DZZD DK – Consult
    Contract total funded value: 5 736.96
  • Differentiated position 3: Обособена позиция №3 ,, Изготвяне на обследвания за установяване на техническите характеристики, свързани с изискванията по чл. 169, ал. 1 (т. 1 - 5) и ал. 2 от ЗУТ и съставяне на технически паспорт на съществуващ строеж и обследване за енергийна ефективност на сгради с административен адрес гр. Севлиево, ул. ,,Асен и Илия Пейкови № 13-15, представляващ РЗП 609,00 кв.м., и на сграда с административен адрес гр.Севлиево, ул. ,,Асен и Илия Пейкови" № 18-20, представляващ РЗП 1416,00 кв.м; и на сграда с административен адрес гр.Севлиево, ул. ,,Стефан Пешев "№ 86-88, представляващ РЗП 1 865,00 кв.м
    Contractor: Mega Build Ltd
    Contract total funded value: 12 510.24
  • Differentiated position 4: Обособена позиция №4 ,, Изготвяне на обследвания за установяване на техническите характеристики, свързани с изискванията по чл. 169, ал. 1 (т. 1 - 5) и ал. 2 от ЗУТ и съставяне на технически паспорт на съществуващ строеж и обследване за енергийна ефективност на сгради с административен адрес гр. Севлиево, ул. ,,Стоян Бъчваров №1, №3, №5, №7, представляващ РЗП 3 627,05 кв.м
    Contractor: Arhkon Project Limited Liability Company
    Contract total funded value: 6 441.63
  • Differentiated position 5: Обособена позиция №5 ,, Изготвяне на обследвания за установяване на техническите характеристики, свързани с изискванията по чл. 169, ал. 1 (т. 1 - 5) и ал. 2 от ЗУТ и съставяне на технически паспорт на съществуващ строеж и обследване за енергийна ефективност на сгради с административен адрес гр. Севлиево, ул. ,,Здравец" №10, вх. А и вх. Б, представляващ РЗП 1419,00 кв.м., на сграда с административен адрес гр.Севлиево, ул. ,,Неофит Рилски" № 25, представляващ РЗП 174,00 кв.м; и на сграда с административен адрес гр.Севлиево, ул. ,,Братя Бъкстон "№ 12, представляващ РЗП 1 544,00 кв.м.
    Contractor: Multiplex Engineering Consortium - Life Energy
    Contract total funded value: 6 813.56
  • Differentiated position 6: Обособена позиция №6 ,, Изготвяне на обследвания за установяване на техническите характеристики, свързани с изискванията по чл. 169, ал. 1 (т. 1 - 5) и ал. 2 от ЗУТ и съставяне на технически паспорт на съществуващ строеж и обследване за енергийна ефективност на сгради с административен адрес гр. Севлиево, ул. ,,Иван Преснаков" № 4-6, , представляващ РЗП 1793,00 кв.м., на сграда с административен адрес гр.Севлиево, ул. ,,Ален Мак" № 6, представляващ РЗП 935,00 кв.м; и на сграда с административен адрес гр.Севлиево, ул. ,,Братя Бъкстон "№ 12, представляващ РЗП 1 544,00 кв.м.
    Contractor: Energy Survey Consortium
    Contract total funded value: 6 547.20
  • Differentiated position 7: Обособена позиция №7 ,, Изготвяне на обследвания за установяване на техническите характеристики, свързани с изискванията по чл. 169, ал. 1 (т. 1 - 5) и ал. 2 от ЗУТ и съставяне на технически паспорт на съществуващ строеж и обследване за енергийна ефективност на сгради с административен адрес гр. Севлиево, ул. ,,Хаджи Димитър " №4, представляващ РЗП 1 250,00 кв.м., на сграда с административен адрес гр.Севлиево, ул. ,,Асенова" № 33-35, представляващ РЗП 343,84 кв.м. ;на сграда с административен адрес гр.Севлиево, ул. ,,Мара Гидик" № 15, предстаяващ РЗП 452,00 кв.м.; на сграда с административен адрес гр. Севлиево, ул. ,, Люляк "№11, представляващ РЗП 838,00кв.м.
    Contractor: Sinko Engineering Joined Stock Company
    Contract total funded value: 9 343.64
  • Differentiated position 8: Обособена позиция №8 ,, Изготвяне на обследвания за установяване на техническите характеристики, свързани с изискванията по чл. 169, ал. 1 (т. 1 - 5) и ал. 2 от ЗУТ и съставяне на технически паспорт на съществуващ строеж и обследване за енергийна ефективност на сгради с административен адрес гр. Севлиево, ул. ,,Видима" № 14-16-18, представляващ РЗП 2 895,00 кв.м.
    Contractor: DZZD DK – Consult
    Contract total funded value: 6 044.76
  • Differentiated position 9: Обособена позиция №9 ,, Изготвяне на обследвания за установяване на техническите характеристики, свързани с изискванията по чл. 169, ал. 1 (т. 1 - 5) и ал. 2 от ЗУТ и съставяне на технически паспорт на съществуващ строеж и обследване за енергийна ефективност на сгради с административен адрес гр. Севлиево, ж.к. ,,Д-р Атанас Москов " блок 1, вх. А и вх. Б, представляващ РЗП 1 422,00 кв.м., на сграда с административен адрес гр.Севлиево, ул. ,,П.Р.Славейков " № 34, представляващ РЗП 670,00 кв.м. ; на сграда с административен адрес гр.Севлиево, ул. ,,Свети Княз Борис I" № 11, предстаяващ РЗП 192,00 кв.м.; на сграда с административен адрес гр. Севлиево, ул. ,, Цар Симеон Велики "№ 18-20, представляващ РЗП 792,00кв.м.
    Contractor: Sinko Engineering Joined Stock Company
    Contract total funded value: 9 966.24
  • Differentiated position 10: Обособена позиция №10 ,, Изготвяне на обследвания за установяване на техническите характеристики, свързани с изискванията по чл. 169, ал. 1 (т. 1 - 5) и ал. 2 от ЗУТ и съставяне на технически паспорт на съществуващ строеж и обследване за енергийна ефективност на сгради с административен адрес гр. Севлиево, ул. ,,Стефан Пешев " № 46-48, , представляващ РЗП 2 215,00 кв.м., на сграда с административен адрес гр.Севлиево, ул. ,,Никола Дабев" № 43-45, представляващ РЗП 688,50 кв.м.
    Contractor: Energy Survey Consortium
    Contract total funded value: 6 967.20
Procedure 3 Subject to due process: „Инженеринг – проектиране, СМР и авторски надзор във връзка с реализацията на проект „Прилагане на мерки за енергийна ефективност в многофамилни жилищни сгради в град Севлиево“ по Оперативна програма „Региони в растеж“ 2014 – 2020“, и по Приоритетна ос 2: „Подкрепа за енергийна ефективност в опорни центрове в периферните райони“, по четири обособени позици", Estimated Amount: 3 599 727.33
  • Differentiated position 1: Обособена позиция № 1: Включва шест сгради с административен адрес: гр. Севлиево, ул. „Стефан Пешев” № 86А-88 гр. Севлиево, ул. „Стефан Пешев” № 103 А и Б гр. Севлиево, ул. „Никола Дабев” № 43-45 гр. Севлиево, ул. „Свети княз Борис І” № 11 гр. Севлиево, ул. „Стефан Пешев” № 46-48 гр. Севлиево, ул. „Иван Преснаков” № 4-6
    Contractor: Stroicomerce LTD
    Contract total funded value: 1 095 720.00
  • Differentiated position 2: Обособена позиция № 2: Включва шест сгради с административен адрес: гр. Севлиево, ул. „Петко Рачев Славейков” № 34 гр. Севлиево, ул. „Асен и Илия Пейкови” № 18-20 гр. Севлиево, ул. „Асен и Илия Пейкови” № 13-15 гр. Севлиево, ул. „Люляк” № 11 гр. Севлиево, ул. „Хаджи Димитър” № 4 гр. Севлиево, ж.к. „Д-р Атанас Москов” бл.1
    Contractor: BIBO 69 EOOD
    Contract total funded value: 842 976.06
  • Differentiated position 3: Обособена позиция № 3: Включва шест сгради с административен адрес: гр. Севлиево, ул. „Видима” № 14-16-18 гр. Севлиево, ул. „Здравец” № 10, вх. А и Б гр. Севлиево, ул. „Здравец” № 6 гр. Севлиево, ул. „Асенова” № 33-35 гр. Севлиево, ул. „Мара Гидик” № 15 и ул.“В.Г.Ченчеви“ № 46А гр. Севлиево, ул. „Равна гора” №2
    Contractor: DZZD CERB EAD-ARTIS LTD
    Contract total funded value: 1 325 244.00
  • Differentiated position 4: Обособена позиция № 4: Включва пет сгради с административен адрес: гр. Севлиево, ул. „Ален Мак” № 6 гр. Севлиево, ул. „Цар Симеон Велики” № 18-20 гр. Севлиево, ул. „Братя Бъкстон” № 12 гр. Севлиево, ул. „Стоян Бъчваров” № 1,3,5,7 гр. Севлиево, ул. „Неофит Рилски” № 25
    Contractor: BIBO 69 EOOD
    Contract total funded value: 933 711.05
Procedure 4 Subject to due process: Екип за управление и изпълнение , Estimated Amount: 0.00
  • Differentiated position 1: Калина Стефанова Георгиева
    Contractor: Kalina
    Contract total funded value: 21 428.57
  • Differentiated position 2: Петър Евгениев Бончев
    Contractor: Petar
    Contract total funded value: 8 000.00
  • Differentiated position 3: Виолета Петрова Монева
    Contractor: Violeta
    Contract total funded value: 4 685.71
  • Differentiated position 4: Дияна Тодорова Петрова
    Contractor: Diyana
    Contract total funded value: 7 200.00
  • Differentiated position 5: Силвия Иванова Станкова
    Contractor: Silviya
    Contract total funded value: 14 400.00
  • Differentiated position 6: Стефка Дамянова Данкова
    Contractor: Stefka
    Contract total funded value: 12 571.43
  • Differentiated position 7: Светла Цанева Ценова
    Contractor: Svetla
    Contract total funded value: 7 200.00
  • Differentiated position 8: Таня Радославова Станева
    Contractor: Tanya
    Contract total funded value: 7 200.00
Procedure 5 Subject to due process: Информация и публичност, Estimated Amount: 21 471.04
  • Differentiated position 1: Договор публичност
    Contractor: "ADASA 7"LTD
    Contract total funded value: 25 765.24
Procedure 6 Subject to due process: Одит, Estimated Amount: 25 000.00
  • Differentiated position 1: Договор одит
    Contractor: Storm Odit LTD
    Contract total funded value: 30 000.00

Notes:

All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN