Identification
Name | Address |
131071847 ENEFECT CONSULT | България, гр.София, 1000, бул. “Христо Смирненски” 1, III ет |
List of projects in which the organization is involved as a contractor
Project Name | UMIS Number | Contracts amount | Reported amount |
Increasing production efficiency in Universalstroi Ltd. through implementation of energy efficiency measures | BG16RFOP002-3.001-0463-C01 | 1 080.00 | 11 200.00 |
Energy efficiency improvement in Revuele Ltd. | BG16RFOP002-3.001-0009-C01 | 11 160.00 | 12 400.00 |
Increasing energy efficiency in Traktor Ltd. | BG16RFOP002-3.001-0034-C01 | 6 750.00 | 7 500.00 |
Energy Efficiency Improvement in IKO OOD | BG16RFOP002-3.001-0295-C01 | 16 380.00 | 18 200.00 |
Improving energy efficiency in "Karieri-P.D." OOD | BG16RFOP002-3.001-0238-C01 | 0.00 | 3 900.00 |
Improving energy efficiency in "STROY - SPEED" OOD | BG16RFOP002-3.001-0199-C01 | 3 510.00 | 3 900.00 |
Improving energy efficiency in "Helfi plastics" Ltd. | BG16RFOP002-3.001-0550-C01 | 0.00 | 5 100.00 |
Improving energy efficiency in V and T Trade Ltd by investment in energy-efficient extrusion line for the production of thermoforming film | BG16RFOP002-3.001-0135-C01 | 4 950.00 | 5 500.00 |
Increasing energy efficiency in T/Blok Ltd. | BG16RFOP002-3.001-0211-C01 | 8 010.00 | 8 900.00 |
Increasing energy efficiency in Metal In Ltd. | BG16RFOP002-3.001-0170-C01 | 9 090.00 | 10 100.00 |
Increasing energy efficiency in Patlidganski Ltd. | BG16RFOP002-3.001-0105-C01 | 6 030.00 | 6 700.00 |
Improving energy efficiency in "PREDSEDNIK" EOOD | BG16RFOP002-3.001-0068-C01 | 0.00 | 3 800.00 |
Improving energy efficiency in "INEX TRADE" LTD | BG16RFOP002-3.001-0218-C01 | 0.00 | 4 400.00 |
Increasing energy efficiency in Gurtsov Ltd. | BG16RFOP002-3.001-0121-C01 | 9 450.00 | 10 500.00 |
Improving energy efficiency in "PLASTTRADE" EOOD | BG16RFOP002-3.001-0208-C01 | 3 510.00 | 3 900.00 |
Increasing energy efficiency in ET "Ivaylo Neshev - NESH-I" | BG16RFOP002-3.001-0736-C01 | 3 600.00 | 4 000.00 |
Energy efficiency in "Ludal Friction" Ltd. | BG16RFOP002-3.001-0514-C02 | 6 480.00 | 7 200.00 |
Support for increasing energy efficiency in BONNER Ltd. | BG16RFOP002-3.001-0820-C01 | 6 480.00 | 7 200.00 |
Support for increasing the energy efficiency of "Fiesta 13" Ltd. | BG16RFOP002-3.001-0455-C02 | 12 690.00 | 14 100.00 |
Increasing energy efficiency in NAIDEN KIROV Jsc. | BG16RFOP002-3.002-0045-C01 | 6 000.00 | 6 000.00 |
Increasing energy efficiency in Unit Total Real Ltd. through the acquisition of new production equipment and the introduction and certification of an energy management system | BG16RFOP002-3.001-0387-C01 | 4 950.00 | 5 500.00 |
"Energy efficiency in" Velpa" Ltd." | BG16RFOP002-3.001-0317-C01 | 4 410.00 | 4 900.00 |
Introduction of energy efficiency improvement measures at "EMI"Ltd. | BG16RFOP002-3.001-0560-C02 | 11 070.00 | 12 300.00 |
Pilot and Demonstration Effective Resource Initiatives at EM ES GROUP Ltd. | BG16RFOP002-3.004-0142-C01 | 0.00 | 14 500.00 |
Increasing energy efficiency in "ITD" Ltd. | BG16RFOP002-3.002-0090-C01 | 2 900.00 | 5 800.00 |
Improving the energy efficiency of "Momina Krepost" AD | BG16RFOP002-3.002-0125-C01 | 3 400.00 | 6 800.00 |
Resource efficiency at INTERPLAST Ltd. | BG16RFOP002-3.004-0026-C01 | 5 110.00 | 7 300.00 |
Improvement of the resource efficiency of Metal In through introduction of pilot for Bulgaria technologies for alkaline electrolytic zinc coating /galvanization/ and system for monitoring and resource optimization of dry spray painting for metal products | BG16RFOP002-3.004-0085-C02 | 7 420.00 | 10 600.00 |
Modernization of the fish farm "Haritov Chiflik" | BG14MFOP001-2.016-0002-C02 | 5 500.00 | 5 500.00 |
Refrigerated Dairy Storage and Cutting Base and Modernization of an Existing Enterprise | BG06RDNP001-4.001-0141-C06 | 3 500.00 | 7 000.00 |
Construction of a refrigeration base for storing, cutting and dispatch of dairy products and purchasing of technological equipment | BG06RDNP001-4.001-0205-C04 | 3 450.00 | 0.00 |