UMIS Number | BG-RRP-4.020-0058-C01 |
Project Name | Ongoing repair for the introduction of energy efficiency measures, provision of an accessible environment and construction of a hybrid photovoltaic system for the production of electricity in the building of the RSPBZN–Knezha and ongoing repair for introduction of energy efficiency measures and provision of an accessible environment in a building of RSPBZN-Nikopol |
Beneficiary | 129010972 Regional Directorate "Fire Safety and Civil Protection" - Pleven |
Funding | RRF ==> Recovery and Resilience Plan |
Date of the Contract/Order | 23.04.2024 |
Start Date | 23.04.2024 |
End Date | 30.06.2026 |
Status of Implementation of the Contract/Order of the Grant | In execution (starting date) |
Location of Performance |
|
Brief description |
Сградата на РСПБЗН–Кнежа е построена през 1979 г., а на РСПБЗН–Никопол през 1978 г. Сградите са с ниска степен на енергийна ефективност. Извършеното през 2023 г. енергийно обследване показа, че при сегашното състояние изискваните санитарно – хигиенни норми за топлинен комфорт се постигат при голям разход на енергия, което налага предприемане на мерки за повишаване на енергийната ефективност на сградите. Предложението за инвестиции (ПИ) включва дейности основно по енергийно обновяване чрез въвеждане на мерки за енергийна ефективност: топлоизолиране на външни стени, подмяна на дограма, топлоизолиране на покривни конструкции, подмяна на осветителни тела, дейности по осигуряване на достъпна среда в сградите и ремонтни дейности, предписани в техническо обследване; само за сграда на РСПБЗН-Кнежа: топлоизолиране на подови конструкции, въвеждане на термо-помпена система за отопление/охлаждане, въвеждане на система за битова гореща вода с термодинамични електрически отоплители, изграждане на хибридна фотоволтаична система за производство на електроенергия за собствени нужди с мощност 30 kWp; само за сграда на РСПБЗН-Никопол: подмяна на съществуваща котелна инсталация. Очакваните резултати от реализацията на ПИ са следните: извършено енергийно обновяване на 2 административни сграда публ. държавна собственост общо 1145,5 кв.м. подобрена публична инфраструктура, постигане спестяване на първична енергия: 83,58% за сграда на РСПБЗН-Кнежа и 87,99% за сграда на РСПБЗН-Никопол при спазване на „принципа за ненанасяне на значителни вреди“, достигане на клас на енергопотребление „А“, подобряване на експлоатационните характеристики за удължаване на жизнения цикъл на сградите, устойчиво управление и рентабилна поддръжка на сградите. ПИ генерира резултати, които ще бъдат ползвани след приключването на предвидените дейности от целевите групи - служители от районните служби, които изпълняват служебните си задължения в сградите, и граждани, на които се предоставят административни услуги. |
Activities |
|
Partners | None |
Contractors |
|
Subcontractors | None |
Members of the Consortium | None |
Notes: * The projected contract value may be lower than the reported one because of any of the following reasons:
** This column represents the amount of costs claimed by the beneficiary |
Indicator 1 | Намаляване на емисиите на парникови газове, Measure Unit: тонове CO2 екв., Base Value: 0.00 , Target amount: 127.81 , Reached amount: 0.00 |
Indicator 2 | Completed energy-efficiency renovation of non- residential buildings – renovated surface of public buildings (sub-measure 2), Measure Unit: m2, Base Value: 0.00 , Target amount: 1 145.50 , Reached amount: 0.00 |
Indicator 3 | Reduction of annual primary energy consumption, Measure Unit: kWh/година, Base Value: 0.00 , Target amount: 491 176.36 , Reached amount: 0.00 |
Indicator 4 | Completed energy renovation of non-residential buildings – number of renovated buildings (sub-measures 2 and 3), Measure Unit: Брой, Base Value: 0.00 , Target amount: 2.00 , Reached amount: 0.00 |
Total Project cost | 756 803.71 BGN |
Grant | 729 143.71 BGN |
Self amount | 27 660.00 BGN |
Total actual amounts paid | 1 225.00 BGN |
Percentage of EU co-financing | 83.33 % |
None | |
Notes: 1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower. 2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment. |
Procedure 1 |
Subject to due process: Доставка на временни и постоянни обяснителни табели и банер,
Estimated Amount: 1 000.00
|
Procedure 2 |
Subject to due process: Извършване на оценка на съответствието на проект съгласно чл. 142 и чл. 169 от Закона за устройство на територията и осъществяване на строителен надзор,
Estimated Amount: 14 060.76
|
Procedure 3 |
Subject to due process: Изготвяне на независима експертна оценка от сертифициран енергиен одитор,
Estimated Amount: 6 876.00
|
Procedure 4 |
Subject to due process: Инженеринг за въвеждане на мерки за енергийна ефективност, осигуряване на достъпна среда и изграждане на хибридна фотоволтаична система за производство на електроенергия за собствени нужди в сграда на Районна служба "Пожарна безопасност и защита на населението" - Кнежа с идентификатор 37376.1002.3758.1 по КК на гр. Кнежа, находяща се в гр. Кнежа, ул. „Марин Боев“ № 3, и за въвеждане на мерки за енергийна ефективност и осигуряване на достъпна среда в сграда на Районна служба "Пожарна безопасност и защита на населението"–Никопол, находяща се гр.Никопол, УПИ IV-6, пл."Европа" №3,
Estimated Amount: 720 236.57
|
Notes:
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN