Financial Information
3 218 711.05
EUR
3 218 711.05
EUR
0.00
EUR
3 380 060.72
EUR
85.00
%
Financial Corrections
| Reason | % of financial correction |
Financial corrections amounts1,2 | Contract | ||
|---|---|---|---|---|---|
| Grant | Self-financing | Total | |||
| Нарушения в документацията за обществени поръчки | 5.00 | 6 532.47 | 0.00 | 6 532.47 | RT CONSULTING EOOD |
| Нарушения в документацията за обществени поръчки | 5.00 | 106 865.58 | 0.00 | 106 865.58 | Astral Engeneering LTD |
| Нарушения в документацията за обществени поръчки | 5.00 | 54 922.38 | 0.00 | 54 922.38 | Rose valley group - Engeneering EOOD |
| Нарушения в документацията за обществени поръчки | 10.00 | 13 976.67 | 0.00 | 13 976.67 | DZZD "NOV GRAD" |
| Нарушения в документацията за обществени поръчки | 10.00 | 303.71 | 0.00 | 303.71 | HERMES MEDIA ADVERTISING AND CONSULTINGS EOOD |
| Нарушения в документацията за обществени поръчки | 10.00 | 1 060.83 | 0.00 | 1 060.83 | Lambadjiev Standart OOD |
| Нарушения в документацията за обществени поръчки | 10.00 | 566.92 | 0.00 | 566.92 | PRO SYSTEM EOOD |
| Нарушения в документацията за обществени поръчки | 10.00 | 1 803.84 | 0.00 | 1 803.84 | ADVICE FORTIS DZZD |
| Нарушения в документацията за обществени поръчки | 5.00 | 920.29 | 0.00 | 920.29 | STROYINVEST CONSULT SOFIA EOOD |
| Липса на добро финансово управление | 5.00 | 106 604.17 | 0.00 | 106 604.17 | Astral Engeneering LTD |
| Липса на добро финансово управление | 5.00 | 54 745.50 | 0.00 | 54 745.50 | Rose valley group - Engeneering EOOD |
Notes:
* The amount of the actual amounts paid cumulative
1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower.
2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment.
Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower.
2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment.
Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
