Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 54 350 TREES
Български

Programme: Environment

Planning region: All

Projects

Total count of contracts 3
Total amount of grant 2 044 237.19 BGN
Total amount 2 044 237.19 BGN
Total count of beneficiaries 3

Data Export Excel HTML XML Print
Beneficiary Address Location Project proposal number Project Name Total Grant Self-financing by the Beneficiary Duration (months) Status of Implementation of the Contract/Order of the Grant
000215630 Gabrovo Municipality Bulgaria, Gabrovo, 5300, площад Възраждане №3
  • Gabrovo
BG16M1OP002-4.004-0001 Rehabilitation of "Sinkevitsa" dam and its facilities, located in Slavovtsi, Gabrovo. 277 621.56 277 621.56 0.00 29 Closed (completion date)
000817696 Municipality Galabovo Bulgaria, Galabovo, 6280, бул. РЕПУБЛИКА № 48
  • Galabovo
BG16M1OP002-4.004-0002 Restoration and strengthening of the wall of the "Haidushko kladenche" and its facilities, located on the territory of the municipality of Galabovo, in order to improve its technical and operational condition, to protect the technical and social infrastructure and to increase the protection of the population against floods 887 593.69 887 593.69 0.00 29 Closed (completion date)
000903825 MUNICIPALITY OF SVILENGRAD Bulgaria, Svilengrad, 6500, бул. БЪЛГАРИЯ № 32
  • Svilengrad
BG16M1OP002-4.004-0006 Introduction of measures for prevention and management of the flood risk on Kelandzhik Dam 879 021.94 879 021.94 0.00 29 Closed (completion date)

Notes:

Elements in light blue allow detailed view when selected
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN
Project cost information in the regions based on the latest update of the Grant contract
The information about the actually paid project amounts is not related to the respective region, but is for the whole project. It is visible when accessing each individual project, and for all projects in the sample - when exporting the data.
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).